Upgraded from wooden construction to a Bailey Bridge design in 2013, this bridge provides a link between Permyjaya and Tudan areas to save on travelling time between the two areas.
Resident Office & District building is a colonial-era building located alongside Kingsway that served as top government administrative office in Miri since the 1950s