Pelita Pedestrian Bridge
Primary tabs

Picture: Design render plans of the Miri-Pujut Pedestrian Bridge.

Pelita pedestrian bridge at the Miri-Pujut Road in front of Pelita Commercial Area is a pedestrian bridge spanning forty six meters from end to end and allows people to walk across to Pelita Commercial Center over the very busy highway without the dangers of getting hit. This bridge links the residential areas at the foothills of Canada Hill Kampung Lereng Bukit to Pelita Commercial Area.
Its design features non-slip tiles on the staircase and a solar powered lighting system.
This bridge was completed in 2015. Although it has been pointed out in various sources that the bridge with 46-metre span is the longest, it is only longest of the three projects (Boulevard, Pelita & Morsjaya). The longest bridge is still the first bridge in Kingsway which connects to the MCC multi-story car park building.
#pedestrianbridgemiri
...
A curious water feature structure deep in the thick jungles of Canada Hill, which people coined "Japanese Waterfall", but could it actually be a much older Colonial times dam structure?
Located along China Street, Cathay Cinema was one of the three large purpose-built movie theatres in Miri. Like the other cinemas of the time, the building was basically a large hall with rows of seats within and a small stage at the end, with projector screens on the wall.
Miri was bombed by U.S. B24 Bombers during World War II. Some video footage of the bombing.